Material: | Diamond |
---|---|
Abrasive: | Superabrasive |
Shapes: | Edge Shape |
Still deciding? Get samples of US$ 2/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item
|
Color
|
Size(mm)
|
MOQ
|
Cut-off wheel
|
red
black
brown
|
100*2*16
|
2PCS(100-250MM)
50PCS(300-400MM)
|
180*3*22
|
|||
355*3.2*25.4
|
|||
customized
|
You can use it for grinding application for cast steel, steel, structural steel, tool steel,etc. suitable for all Metallic types.Also suitable for stone, glass and other polishing.
Resin bonded cutting-off wheels can offer an excellent performance for all sorts of cuttings jobs on a variety of different metals. They are particularly suited for cutting into tight spaces, smoothing corners and curves, polishing weld seams and many different industrial applications. They can be used on angle grinders, portable power tools and stationary machines.
International Leading Trade Fair
for Grinding Technology
Zhengzhou Ruizuan Diamond Tools Co..Ltd. is committed to providing customers with tools for grinding, cutting, turning, millingdrilling, and reaming. It includes abrasive tools&wheels, diamond/CBN wheels &tools, PCD/PCBNinserts&tools, tungsten carbide inserts &tool, HSS steel tools&cutters.
Our tools are applied in many different industries. Our customers find good applications in woodworking, metalworking, Automotive, Stone, Glasses, gemstones, Industrial ceramic, oil & Gas drilling and Constructions industries. In these industriesour products are performing well on long lifetimehigh-efficiency and lessunit-cost.
PACKAGE:
SINGLE BOX PER WHEEL,
10 to 20 WHEELS PER CARTON
DELIVERY TIME:
3-30 days after confirming order,detail delivery date should be decided according to
production season and order quantity.