| Manufacturing Process: | Sintered |
|---|---|
| Shape: | Flat-Shaped |
| Bonding Agent: | Electroplated |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Thread grinding operations include external thread grinding (taps and rolls), internal thread grinding (gauges and dies), grinding of thread chasers and worm grinding.
thread grinding wheel is an abrasive tool, used for grinding groove head, edge and square on bits, cast knives and screw taps
| Product name | Thread Grinding Wheel |
| Application | cast iron, carbon steels, alloysteels, tool steels |
| Size | 125mm,150mm,200mm |
| Work piece | cast iron,carbon steels, alloysteels, and tool steels |
Precision grinding for unhardened and hardenedsteels,such as cast iron,carbon steels, alloysteels, and tool steels, etc.
Application Machine:HERTLEIN,NORMAC,MATRIX,JUNKER,LIDKOPPING etc



International Leading Trade Fair
for Grinding Technology
Zhengzhou Ruizuan Diamond Tools Co..Ltd. is committed to providing customers with tools for grinding, cutting, turning, millingdrilling, and reaming. It includes abrasive tools&wheels, diamond/CBN wheels &tools, PCD/PCBNinserts&tools, tungsten carbide inserts &tool, HSS steel tools&cutters.
Our tools are applied in many different industries. Our customers find good applications in woodworking, metalworking, Automotive, Stone, Glasses, gemstones, Industrial ceramic, oil & Gas drilling and Constructions industries. In these industriesour products are performing well on long lifetimehigh-efficiency and lessunit-cost.
PACKAGE:
SINGLE BOX PER WHEEL,
10 to 20 WHEELS PER CARTON
DELIVERY TIME:
3-30 days after confirming order,detail delivery date should be decided according to
production season and order quantity.